From Historian Replay to a Live Digital Twin Workflow in PMV™

How SIMACRO extended an existing hybrid color prediction model into an automated digital twin workflow for a plant in Europe.

In an earlier project with Plant Z, SIMACRO developed a hybrid model that combined Aspen Plus simulation with AI/ML to predict polymer color. The follow-up pilot asked what it would take to use that model as operating measurements arrived. A steady-state model needs suitable inputs, so the workflow had to decide when the process was stable enough to run. It also had to carry the results through to a dashboard where engineers could review them alongside measured product quality.

Using ProcessModel V™ (PMV™), we connected those steps in one workflow. The pilot began with a practical engineering choice: replay previously recorded plant measurements to simulate a live data feed.

Giving historical data a live role

In the original modeling work, historical plant data helped identify stable operating periods for model development. In the pilot, historian data played a different role. We prepared samples from Plant Z’s historian and fed them into PMV in timestamp order, so the workflow received new values as it would from a live source.

This gave the team a way to test the sequence independently of the plant’s process systems and live instrumentation. Engineers could replay the same operating history and review how the workflow responded as conditions changed. They could see which periods qualified for a model run, when the workflow waited, and what it predicted once stable conditions returned.

Using Live Stability Analysis to decide when to simulate

Historian samples are replayed as a simulated live feed. PMV evaluates incoming data for stability, runs the Aspen Plus and AI/ML models during qualifying periods, and writes the results to a database that feeds the dashboard.

As samples entered PMV, Live Stability Analysis evaluated the incoming measurements against the process stability criteria. For each qualifying operating window, the workflow used representative values from that window as inputs to the steady-state Aspen Plus model. During unstable periods, it continued evaluating incoming measurements and waited for a suitable window.

This step turned an engineering judgment into an execution rule. The arrival of a new measurement prompted a stability check. The identification of a stable operating window prompted a simulation. That sequence allowed the team to test how the workflow selected inputs as data arrived.

Connecting simulation and color prediction on the PMV Canvas

The PMV Canvas connected Live Stability Analysis to the Aspen Plus and AI/ML models. Once a stable window triggered an Aspen Plus run, the workflow passed calculated process properties together with selected operating measurements to the AI/ML model, which predicted the polymer color indices.

An engineer initiated the workflow once. From there, stability analysis, simulation, and prediction proceeded automatically as qualifying data became available. The Canvas showed how the measurements and model outputs passed from one step to the next, making it easier to follow how each prediction was produced.

Updating the dashboard as new results became available

The workflow stored the stability assessments, simulation outputs, and color predictions in a database. The connected dashboard updated automatically as new results became available, giving engineers a single view of when stable conditions were detected, what the simulation calculated, and what the hybrid model predicted. Where lab measurements were available, engineers could compare them with the predicted color indices.

Example of a customizable PMV™ dashboard for monitoring selected KPIs through a range of visualizations.

Illustrative video of a PMV™ dashboard showing how Live Stability Analysis results update as new data arrives.

What the pilot demonstrated

By replaying historian data, the team could test the full data-to-dashboard workflow before connecting it to a live plant feed. The pilot showed how an existing hybrid model could run automatically when the incoming data met the engineering criteria and deliver results that engineers could review as they became available.

Related reading: SIMACRO’s earlier article on hybrid modeling for polymer color prediction.

Written by Angela Park, Hyeongheon Im
SIMACRO media team | media@simacro.com

Next
Next

PMV™ Integrates Complex Models and Plant Data for RNG Methane Recovery